Radhi Small Hydro Power Project

Installed Capacity:
4.4 MW

Tallo Khare Khola Hydro Power Project

Installed Capacity:
11 MW

Syange Hydro Power Project

Installed Capacity:
183KW

About Us

CEDB Hydro Fund Limited (CHF), a public limited company incorporated under the prevalent laws of Nepal on Mangsir 15, 2066 (November 30, 2009). CEDB Hydro Fund Limited (CHF) was founded by the then Clean Energy Development Bank to provide equity investment for hydropower projects to meet energy needs of the nation. CHF is currently mandated to invest in and develop Hydropower Projects. It has got three hydropower projects in operation and four projects at construction and development stages.

 

Projects Under Development

1. Tallo Khare Khola Hydropower Project (11 MW)

2. Dordi I Hydro Electric Project (12 MW)

3. Rukum Gad Hydropower Project (5 MW)

4. Kasuwa Hydropower Project (45 MW)

 

Projects Under Operation

1. Radhi Small Hydropower Project (4.4 MW)

2. Syange Hydropower Project (183 KW)

3. Khudi Hydropower Project (4 MW)

 

Vision

"To be a leading private hydropower player by strengthening and mobilizing capital for accelerated hydropower development in Nepal"

 

Authorized Capital : NRs. 15000 Million

Issued Capital : NRs. 839.41 Million

Paid Up Capital : NRs. 587.587 Million

 

© CEDB Hydro Fund Limited. All Rights Reserved.
Site by: