Radhi Small Hydropower Project

Welcome Radhi Small Hydropower Project is being developed constructed and operated by Radhi Bidyut Company Limited (RBCL). This Project is a Run off River type Hydropower project with generating capacity of 4.4 MW. According to the prevailing rules and regulations, the proponent has acquired Electricity Generation License from Ministry of Energy and concluded Power Purchase Agreement with NEA for 4.4 MW. The rate of energy as agreed in PPA is NRs. 8.40 for dry season (Poush to Chaitra) and NRs. 4.80 for remaining month which is considered as wet season. The PPA rate will escalate by 3% each year up to 5 year. The power generated from the project is evacuated to Chiplabesi substation, Lamjung. The Commercial Operation Date of the project is 31 Jestha, 2071 B.S.

The main features of Radhi Small Hydropower Station are:

Installed Capacity        :    4.4 MW
Design Flow                 :    870l/s
Gross Head                  :    616 meters
Total Energy                  :    26.267 GWh
Dry Season                   :    5.09 GWh
Wet Season                  :    21.17 GWh

 